NuovoDoc

c080601 NuovoDoc Construction Note
Site Repaving
Diary & Job Jar

NuovoDoc>construction>
2008>06>

c080601a>
0.00 2013-11-29 09:46 -0800

Status

Date

Description

  2008-06-04
NuovoDoc> repaving> 2008-06-04 announcement>


NuovoDoc Is Being Repaved.

The NuovoDoc site is being repaved to correct problems resulting from movement to a new web server.   At the same time, the site is being adjusted to use the latest styles and formats that are applicable to this and other sites of the nfoCentrale.net family.

Check the Site Repaving Project pages for additional details on the approach to repaving and its tracking.  Contact the technical coordinator with questions and to report any defects that you notice.

 

     
     
     
     
     
     
in progress 2013-11-29 c080601: Repave to current Construction Structure styles and formats: c080601, c080601a, c080601b, c080601b1, c080601c, c080601c1, c080601c2, c080601c3, c080601c4
  2008-07-20 Review #60 NuovoDoc Repaving items, starting back at #60.158
  2008-07-19 c080601: Re-align the tree structure in Table 1 to be uniform and nicely left-justified
in progress 2008-07-19 Foyer: Do the breadth-first spread through the top-level subordinates, managing from the Front Porch Construction Zone
  2008-06-24 c080601c: The different inserts should list the nature of the style inclusions.  It is going to be important to repave construction/templates/00/ with the information that applies to styles.  For normal documents, there are important styles for catalogs, diary & job jars, etc. There need to be templates for folios (that would handle some of this) too.  Some of this could be at the nfoCentrale.net level also. [dh:2008-06-24 There is enough information here on the bootstrapping and the notices.  The notices might link to the relevant sections of the construction templates, when those indicate the rules being followed.  That is not urgent.]
  2008-06-24 "Go green" all the way to the front porch when the template customizations are complete
  2008-06-24 Review and customize c000005
  2008-06-24 Review and customize c000004
  2008-06-24 Review and customize c000003
  2008-06-24 Conduct review of the Construction Material content, operating from that Construction Zone
  2008-06-24 c080601c: Reduce the business in the version progression block
  2008-06-24 c080601c: Fix the spacing in the bulleted lists
done 2008-07-20 c080601c1: Correct the title for NuovoDoc repaving
done
2008-07-20
2008-07-19 c080601: Put links to foyer structure/zones in the table
done
2008-07-20
2008-07-19 c080601: Correct page title for NuovoDoc
done 2008-07-19 Foyer: Start the Construction Zone
done 2008-07-19 Front Porch Foyer: Start the Construction Structure
done
2008-07-19
2008-06-24 c080601: There should be a link to the construction structure and construction zone descriptions when they are available.  This is for checking on changes that may be pending or in progress that someone might review when verifying a problem.
done
2008-07-19
2008-06-24 c080601: Create a table that shows what modifications were done and when they were done.  [dh:2008-06-24 This is accomplished by basically replicating the construction structure of the site and indicating when each node goes green.]
done 2008-06-24 Review and customize c000006
done 2008-06-24 Verify that the construction structure is stitched through this folio correctly, allowing that part to be marked as completed.
done
2008-06-24
2008-06-04


The Content Material here was successfully customized as part of the
2008-06-04 stage of Site Repaving.  Check those pages for additional details of the approach to repaving and customization. 
Contact the technical coordinator with questions and to report any defects that you notice.

This notice applies to this folio.  It signifies that the pages of this folio are of correct form and customized for this site.  [dh:2013-11-29 There are more Style and Format adjustments introduced since.   These are being promulgated as part of revival of this same repaving.]

done 2008-06-24 c080601: Revamp text to apply to repaving
done 2008-06-24 c080601c: Revamp text to apply to repaving
done 2008-06-24 Identify this material as being repaved with the c080201b1 include page.
done 2008-06-24 Create placeholder ready for further customization to make the NuovoDoc-specific Site Repaving project: c080601, c080601a, c080601b, c080601c, c080601c1, c080601b1, c080601c2, c080601c3, c080601c4
done
2008-06-24
2008-06-04

Customize this page for immediate usage. 

Revision History:
0.00 2008-06-24-09:12 Create Bootstrap Placeholder
Customize for immediate use in repaving the site, with further customization of this folio to follow.

Construction Structure (Hard Hat Area) You are navigating construction material
of NuovoDoc.

created 2008-06-04-12:03 -0700 (pdt) by orcmid
$$Author: Orcmid $
$$Date: 11/29/13 9:47a $
$$Revision: 91 $